You don't have javascript enabled. Good luck with that.
Pencarian
Dua Alat Berat Keruk Embung Pekayon
....
photo Nurito - Beritajakarta.id

Two Heavy Equipment Deployed to Dredge Pekayon Retention Basin

Two heavy equipment consisting of long arm and amphibious dredger were deployed by East Jakarta Water Resources (SDA) Sub-agency to dredge Pekayon Retention Basin (Embung) in Pekayon Urban Village, Pasar Rebo.

Dredging is carried out with varying depths between 3-5 meters

East Jakarta SDA Sub-agency's Maintenance Section Head, Puryanto conveyed, Pekayon Retention Basin which covers an area around two hectares had been dredged since two and a half months ago. The work is targeted to be completed next month.

"Dredging is carried out with varying depths between 3-5 meters, thus retention basin has more capacity to hold water discharge," he explained, Wednesday (9/15).

Retention Basin Construction at Lokbin Tegal Alur Public Housing is Completed

According to him, mud and soil which dredged from the location will be used to build inspection road on the sides of retention basin.

Moreover, his side will also build embankment to restrain and control water flow that leads to Gongseng connecting (Phb) channel.

"We take this step as an effort to anticipate flooding in Pekayon area," he said.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1204 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1048 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye901 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye727 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye566 personDessy Suciati